Roads and Maritime Services will be conducting roadworks from Sunday evening along the Pacific Highway, at Swansea.
The resurfacing work will be done on the southbound lanes of Swansea Bridge for three nights from January 31.
Work will be conducted between 8pm and 4.30am, with southbound traffic diverted onto the northbound brdige, via contra flow.
Weather permitting, works should be completed by February 7.
During work hours, a reduced, 40 km/h speed limit will be enforced to minimise risk for both workers and motorists.
Additional information can be found on www.livetraffic.com. Motorists can also download the Live Traffic App for smartphones, or call the Transport Management Centre on 132 701.
Image courtesy of Matthew Fern, via Flickr (LINK).